902.883.9685
Home About Us Services Projects News Contact Us
Original scaling and delamination all around window
End wall with stair and vegetation
Condition of interior wall before preparation
Original condition of corner
Applying shotcrete over galvanized mesh
Building up wall with shotcrete
Nozzleman rebuilding corner with shotcrete
Shotcrete placed and finished driveway side
End of building with shotcrete completed before finishing
Completed shotcrete driveway side
View of shotcreted corner and wall
Shotcrete completed at corner
Picture of finished wall
 
Alberta Bridge Rehabilitation Begi
Jun 1, 2017 - Crews have mobilzed to Fabyan, Alberta and the rehabiltation of the bridge over the Battle River is in progress.

© 2019 Eastern Infrastructure. All rights reserved. Website Design by Amplify Media